Las Vegas, New Mexico to begin construction on new water treatment plant

Date:



Las Vegas, New Mexico will begin construction on a water treatment plant this summer to nearly double the city’s water supply. The city has faced ongoing challenges with its water system since the Hermits Peak Calf Canyon Fire in 2022. Fire debris overwhelmed the treatment plant, forcing it to shut down multiple times. At one point, the city had just weeks left of safe drinking water.The new treatment plant will have an initial capacity of 3.56 million gallons per day and will serve a population of 14,880 people.

Las Vegas, New Mexico will begin construction on a water treatment plant this summer to nearly double the city’s water supply.

The city has faced ongoing challenges with its water system since the Hermits Peak Calf Canyon Fire in 2022.

Fire debris overwhelmed the treatment plant, forcing it to shut down multiple times.

At one point, the city had just weeks left of safe drinking water.

The new treatment plant will have an initial capacity of 3.56 million gallons per day and will serve a population of 14,880 people.



Source link

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Team USA eyes Olympic gold in the women’s hockey final

IE 11 is not supported. For an optimal experience...

Alysa Liu returns to Olympic ice

Whoever said "quitters never win," never met Olympic figure...

15 Metal Bands That Need To Reunite

The world of heavy music is doing extremely well...

Nissan Recalls Over 300,000 Rogue SUVs Over Throttle-Gear, Engine-Failure Risks

The National Highway Traffic Safety Administration said the gears...